    题名: 資源可替換的專案排程之研究
    其它题名: A Study on Project Scheduling with Replaceable Resources
    作者: 張文貴;吳國偉
    贡献者: 東海大學理學院
    关键词: 專案管理;最佳排程;資源衝突;資源替換;分佈圖
    Project management;Optimal scheduling;Resource conflicts;Resource replacement;Distribution diagram
    日期: 1997-07-00
    上传时间: 2012-06-29T01:05:24Z (UTC)
    出版者: 台中市:東海大學
    摘要:      專案排程方法自CPM與PERT,以網狀圖技術為基礎而開始發展至今,已有近四十年 的歷史;但是,專案排程所要求的複雜度愈來愈高,不僅需要考慮各活動之間的前、後置關 係,而且還要同時考慮專案中資源、活動與整體專案的各種時間與成本限制,以網狀圖技術 為基礎而發展的各種專案排程方法,已漸感不勝負荷。如何尋求其它的基本技術與工具,而 能快速而有效地解決專案排程中,各種複雜的環境所產生的問題,已成為一項刻不容緩的課 題。 本文針對以上問題,提出以分佈圖為基礎,由專案排程中,活動資源的替換損益成本與使用 期間為基準,發展出一套可替換的資源排程法則,以求取專案的最佳排程,並能於短時間內 系統化檢視、運用閒置的資源,以降低專案的期間與成本,且可避免人為或環境的因素所產 生的誤差。
         It has been nearly forty years since the project scheduling methods such as CPM and PERT developed, which are based on graph technique. However, situations for project scheduling are much more complex than before. It is required to consider not only the precedence relationship among activities, but also the constraints on duration and cost of project resources and activities as well. For times it becomes an important issue to search for other techniques to solve the scheduling problems due to the complex environment. Considering the above difficulty, this research will propose a heuristic method for project scheduling problems with replaceable resources basing on distribution diagram. The algorithm that is derived from the total loss of resource replacement concept and distribution diagram technique, may determine the optimal scheduling of the project. Besides, it may also inspect and take advantage of those idle resources to reduce the duration and cost of the project as much as possible. What is more important, through the rational of the concept of distribution diagram for replaceable resources, the proposed algorithm is capable of avoiding the errors that may be introduced by humans or environment changes.
    關聯: 東海學報第38卷第2期(理學院)
    显示于类别:[校內出版品(學報)] 東海學報

    文件中的档案:

    档案 大小格式浏览次数
    index.html0KbHTML168检视/开启


    在THUIR中所有的数据项都受到原著作权保护.


    本網站之東海大學機構典藏數位內容,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈