Tunghai University Institutional Repository:Item 310901/24665
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 21921/27947 (78%)
造访人次 : 4201774      在线人数 : 160
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://140.128.103.80:8080/handle/310901/24665


    题名: Improving project-profit prediction using a two-stage forecasting system
    作者: Chang, P.-T.;Hung, L.-T.;Pai, P.-F.;Lin, K.-P.
    贡献者: Department of Industrial Engineering and Enterprise information, Tunghai University
    关键词: Fuzzy c-means;Kernel fuzzy c-means;Least-squares support vector regression;Project-profit
    日期: 2013
    上传时间: 2014-05-30T01:53:55Z (UTC)
    摘要: Accurate project-profit prediction is a crucial issue because it can provide an early feasibility estimate for the project. In order to achieve accurate project-profit prediction, this study developed a novel two-stage forecasting system. In stage one, the proposed forecasting system adopts fuzzy clustering technology, fuzzy c-means (FCM) and kernel fuzzy c-means (KFCM), for the correct grouping of different projects. In stage two, least-squares support vector regression (LSSVR) technology is employed for forecasting the project-profit in different project groups, respectively. Moreover, genetic algorithms (GA) were simultaneously used to select the parameters of the LSSVR. The project data come from a real enterprise in Taiwan. In this study, some forecasting methodologies are also compared, for instance Generalized Regression Neural Network (GRNN), Radial Basis Function Neural Networks (RBFNN), and Back Propagation Neural Network (BPNN), to predict project-profit in this real case. Empirical results indicate that the two-stage forecasting system (FCM+LSSVR and KFCM+LSSVR) has superior performance in terms of forecasting accuracy, compared to other methods. Furthermore, in observing the results of the two-stage forecasting system, it can be seen that FCM+LSSVR can achieve superior performance, and KFCM+LSSVR can achieve consistently good performance. Therefore, based on the empirical results, the two-stage forecasting system was verified to efficiently provide credible predictions for project-profit forecasting. ? 2013 Elsevier Ltd. All rights reserved.
    關聯: Computers and Industrial Engineering,Vol.66,Issue4,P.800-807
    显示于类别:[工業工程與經營資訊學系所] 期刊論文

    文件中的档案:

    没有与此文件相关的档案.



    在THUIR中所有的数据项都受到原著作权保护.


    本網站之東海大學機構典藏數位內容,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈