English  |  正體中文  |  简体中文  |  Items with full text/Total items : 21921/27947 (78%)
Visitors : 4247423      Online Users : 429
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://140.128.103.80:8080/handle/310901/6069


    Title: 製造業訂單管理系統之資訊流程與決策模式的建立
    Other Titles: The Development of Information Flow and Decision Model of an Order Management System in Manufacturing Coperation
    Authors: 黃黎毅
    Huang, Li-i
    Contributors: 王立志
    Wang, Li-Chih
    東海大學工業工程與經營資訊學系
    Keywords: 訂單管理系統;訂單資源分配;供給鏈;限制理論;限制條件滿足技術
    Order Management System;Assign Order Source;Supply Chain;Theory of Constraint;Constraint Satisfaction Technique
    Date: 1997
    Issue Date: 2011-05-25T08:47:01Z (UTC)
    Abstract: 過去,企業關注的焦點多在於市場與製造兩方面,寄望能夠充分掌握市場 趨勢,並確實的減少製造成本。而現在愈來愈多的企業開始將焦點擴展至 整個供給鏈,除了基本的市場掌握及製造成本降低的考量外,更關注於如 何有效地減少整個供給鏈的運籌成本(Logistics Cost),以及縮短產品於 供給鏈上的流動時間。因此,若能有效的執行供給鏈管理,則能夠達成上 述的目標。訂單管理功能對企業而言,為接觸顧客的最前線。以往訂單管 理多趨於作業上的處理,對於顧客需求滿足並無直接的幫助。為了縮短產 品於製造產業供給鏈上的流動時間,並達成快速滿足顧客需求的目標,本 研究重新省思訂單管理的功能,並建立訂單管理系統執行之資訊流程與訂 單資源分配功能的決策模式。本研究的進行分為兩階段:第一階段界定訂 單管理的功能,並以功能分解、從上而下設計與輸出-輸入分析的方式建 立訂單管理系統執行之資訊流程,用以探討訂單管理系統運作時各功能間 的資訊傳遞;第二階段則以限制理論(Theory Of Constraint ;TOC)考慮 關鍵資源的概念為基礎,發展訂單資源分配之決策模式,並搭配限制條件 滿足技術,以制定最佳的資源分配策略。
    Appears in Collections:[工業工程與經營資訊學系所] 碩博士論文

    Files in This Item:

    File SizeFormat
    index.html0KbHTML308View/Open


    All items in THUIR are protected by copyright, with all rights reserved.


    本網站之東海大學機構典藏數位內容,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback