English  |  正體中文  |  简体中文  |  Items with full text/Total items : 21921/27947 (78%)
Visitors : 4238381      Online Users : 384
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    碩博士論文 [889/914]
    期刊論文 [89/136]
    專書 [0/8]
    國科會研究報告 [92/144]

    Collection Statistics

    近3年內發表的文件:0(0.00%)
    含全文筆數:35(21.21%)

    文件下載次數統計
    下載大於0次:35(100.00%)
    下載大於100次:35(100.00%)
    檔案下載總次數:10325(1.69%)

    最後更新時間: 2024-12-04 03:41


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed

    Jump to: [Chinese Items]   [0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    or enter the first few letters:   

    Showing items 51-75 of 165. (7 Page(s) Totally)
    << < 1 2 3 4 5 6 7 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2011 Hybrid-GA based Material Allocation Planning for Production Assembly System –A Network Communication Wang, L.C.; 王立志
    2010 The Impact Different Decision Behavior Models of Emergency Physicians on the Performance of Emergency Departments 翁紹仁; Tsai, C-H., Weng, S-J., Huang, C-Y., Yang, C-Y., Li, J-Y. and Tsai, K-T
    The impact of operations strategies for emergency room in Taiwan Weng, S.-J.; Huang, P.-Y.; Chang, W.-H.; Wang, L.-M.; Chang, C.-Y.
    2010 The Innovation of Taiwan Medical Value Chain Management from Transaction Cost Perspective 洪堯勳; Ming-TungSong, Jau-Shin Hon
    2009 Integrated design structure system for modular design in products development Wang, C.-S.a , Wang, W.-H.A.b, Chang, T.-R.c, Lin, M.-C.b
    2010-12 Integration of System Simulation and the Taguchi Method in Solving the Combinatorial Optimization Problem for an Automated Production Line-A Case Study in the Semiconductor Industry Lee, C.K., Weng, S.J., 翁紹仁, Chang, H.N., Lin, Y.H., Chao, Y.C. and Hsu, C.H.
    2008 Jobs scheduling in an assembly factory with space obstacles 彭泉; Perng, C., Y.C.Lai and Z.P.Ho
    2010 M&As productivity change based on the changes in credit risk of Taiwanese commercial banks-DEA Malmquist productivity measure 陳冠中、潘忠煜
    2009 A Modified FTA-FMEA Methodology: an Application for CNT-BLU of TFTLCD 蔡禎騰; Chiou, C.C., J.T. Tsai, and Y.S. Fang
    2009 Multi-site Production Planning Model for the Memory Module Industry 王立志; Li-Chih Wang, Chen-Yang Cheng and Sian-Kun Lin
    2009 A novel post-linearization technique for fully integrated 5.5 GHz high-linearity LNA Chang C.-P., Chen J.-H., Hung S.-H., Su C.-C., Wang Y.-H.
    2008 On space resource constrained job scheduling problems - A container loading heuristic approach Perng, C.a , Lin, S.-S.b , Ho, Z.-P.a
    2008 On space resource constrained job scheduling problems – A container loading heuristic approach 彭泉; Perng, C., S.S.Lin and Z.P.Ho
    2011-07-05 An On-line Structure Learning in Bayesian Network Wang,Wei-Hua Andrew and Chen, Wen-Hsin; 王偉華
    2009 Open Architecture for Collaborative Design 黃欽印; Huang, C.Y., T.T. Yang, W.L. Chen, S.Y. Nof
    2009 Optimization of multi-Echelon supply chain networks using quantum inspired particle swarm methodology 王偉華; M. Bachlaus, F. F. Chen, W.H.A. Wang and D.W Kim
    2010-11 Optimization of plastic injection molding process by dual response surface method with non-linear programming Chen, Wu-Lin, Huang, Chin-Yin and Hung, Chi-Wei; 黃欽印
    2009 Optimization of tardy cost in a space scheduling problem Perng, C., Y.C. Lai and Z.P. Ho; 彭泉
    2007-04-11 Potential assessment of an ellipsoidal neural fuzzy time series model for freeway traffic prediction Pai, P.-F.a , Lin, K.-P.b , Chang, P.-T.b
    2009 A Procurement Negotiation System with Fuzzy-based Intelligent Agents 蔡禎騰; Lin, Shui-Shun, Ying-Shen Juang, Jen-Teng Tsai and Jia-Nan Yen
    2006-07-16 Protein sequence alignment based on fuzzy arithmetic and genetic algorithm Chang, P.-T.ab , Hung, L.-T.ab , Lin, K.-P.ab , Lin, C.-S.ab , Hung, K.-C.ab
    2009 Quantitative Models for Business Process Analysis 鄭辰仰; Cheng, C.Y., and Prabhu, V. V.
    2009 A Quasi-Three-Dimensional allocation algorithm for space scheduling problems 彭泉; Perng, C., Y.C.Lai, S.W. Chiou and Y.H. Tuan
    2005-08-27 Recurrent support vector machines in reliability prediction Hong, W.-C.a , Pai, P.-F.b , Chen, C.-T.c , Chang, P.-T.d
    2009 The relationship between technology acceptance model and usability test - Case of performing E-learning task with PDA Chiou, W.-C.a , Perng, C.b , Lin, C.-C.b

    Showing items 51-75 of 165. (7 Page(s) Totally)
    << < 1 2 3 4 5 6 7 > >>
    View [10|25|50] records per page

    本網站之東海大學機構典藏數位內容,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback