English  |  正體中文  |  简体中文  |  Items with full text/Total items : 21921/27947 (78%)
Visitors : 4237750      Online Users : 289
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://140.128.103.80:8080/handle/310901/24055


    Title: 不平衡多階段類流程式生產之有限產能生產規劃系統發展
    Other Titles: The Development of a Finite Capacity Production Planning System for Imbalanced Multi-Stage Flow Line Based Production
    Authors: 翁玉潔
    Wong,Yu-Jie
    Contributors: 王立志
    Wang, Li-Chih
    工業工程與經營資訊學系
    Keywords: 有限產能規劃;產能規劃;生產線平衡
    Finite Capacity Planning;Capacity Planning;Line Balanced
    Date: 2013
    Issue Date: 2014-02-19T06:59:00Z (UTC)
    Abstract: 為了因應龐大全球性市場需求的挑戰,企業除須具備紮實的生產基礎條件外,更需有效進行採購、生產及銷配運籌管理,以達成降低庫存、縮短由接單至出貨前置時間的目標,進而提升競爭優勢。多階段類流程式生產的生產特性屬於階段式且各階段為截然不同的特性,若未進行完善的生產規劃則會造成庫存高、前置時間長等問題。本研究希望將限制理論結合生產線平衡解決製程間特性極其不平衡的問題,發展一個以有限產能為基礎的生產規劃系統,並從整體系統的觀點解決各站生產特性不平衡及局部最佳化生產排程的問題。目的如下:1.提供保持生產線平衡的規劃方法。2.發展以有限產能為基礎的生產規劃系統。3.提出一個整合的生產規劃系統運作流程與使用情境。
    To fulfill the large demand of market, an enterprise should e and effective in-bound logistics, production logistics and outbound logistics management capability to reduce inventory and the lead time of order to deliver (OTD) process, then, increasing its competitive advantage. Finite Capacity Production Planning System for imbalanced multi-stage flow line based production are totally different. The faulty production planning causes the high level of inventory and long OTD lead time. This research will integrate TOC theory and production line balance model to solve the characteristics of unbalanced problem, and develop the production planning system which is based on finite capacity to systematically solve the problems of imbalance among each production stages and local optimization of production scheduling problems. The objective and expected results of this research may be summarized as follows:1. Provide the method to keep line balance. 2. Develop the production planning system which is based on finite capacity.3. Provide the procedure of an integrated production planning system and use-case.
    Appears in Collections:[工業工程與經營資訊學系所] 碩博士論文

    Files in This Item:

    File SizeFormat
    101THU00030019-001.pdf4534KbAdobe PDF2133View/Open


    All items in THUIR are protected by copyright, with all rights reserved.


    本網站之東海大學機構典藏數位內容,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback