Tunghai University Institutional Repository:Item 310901/499
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 21921/27947 (78%)
造访人次 : 4250677      在线人数 : 422
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://140.128.103.80:8080/handle/310901/499


    题名: 記憶體模組產業之多階多廠彈性供應網絡生產規劃模式
    其它题名: Multi-level and Multi-site Flexible Supply Network Planning Model for Memory Module Industry
    作者: 王文冠
    Wang, Wen-Kuan
    贡献者: 鄭辰仰;王立志
    Cheng, Chen-Yang;Wang, Li-Chih
    東海大學工業工程與經營資訊學系
    关键词: 彈性供應網絡生產規劃、訂單滿足、記憶體模組產業、整數線性規劃
    flexible supply network planning, order allocation, memory module industry, integer linear programming
    日期: 2010
    上传时间: 2011-01-04T08:29:48Z (UTC)
    摘要: 在全球以及多階多廠區的生產環境之下,生產規劃比單廠區更加複雜與困難,記憶體模組產業之供應網絡通常包含多個製造廠與多個配銷中心,為了滿足下游顧客的多種類需求訂單,規劃人員不只需要決定製造廠的訂單分配或決定由哪一個配銷中心出貨,亦需考量記憶體模組產業的相關特性與供應網絡的限制,例如: 物料替代關係、原物料調撥、製造廠直接出貨給顧客、產能限制、運輸與生產前置時間。但過去的文獻中,甚少針對記憶體模組產業之多廠區生產規劃進行探討,且未同時考量該產業之所有生產特性,因此,本研究使用整數線性規劃模式發展一個以成本極小化為目標的記憶體模組產業之彈性供應網絡生產規劃模式,以期產生每週之生產計劃與運輸計畫,供規劃人員進行生產規劃時之參考依據。最後,經由實驗得知本模式所適用的產業環境範圍,並進行參數分析,最後以企業實際資料作為案例驗證的實證。
    Under the global and multi-level, multi-site production environment, production planning is more complex and different than single-site. A memory module industry’s supply chain usually consists of multiple manufacturing sites and multiple distribution centers. In order to fulfill the variety of demands from downstream customers, production planners need not only to decide the order allocation among multiple manufacturing sites and shipment among multiple DCs but also to consider memory module industrial characteristics and supply chain constraints, such as multiple material substitution relationships, raw material re-allocation among manufacturing sites, manufacturing sites’ direct shipment, capacity constraint, transportation lead time, and production lead time. While the previous researches treat supply network problem as a traditional multi-level supply network model, in which arcs should connect the two adjoining echelons in the network and there are no arcs striding over any abutting echelons, thereby the problem can be solved stage by stage. However, in practice the traditional multi-level supply network model sometime causes problems, such as difficulties in accurate inventory controlling, slow response, and lack of flexibility etc. To solve the flexible multi-level supply network problem, we develop an integer linear programming (ILP) to produce a flexible supply network planning (FSNP) model for memory module industry. The weekly optimal plans are attained by FSNP model for planner’s reference which include re-allocation, transportation, and production quantities.
    显示于类别:[工業工程與經營資訊學系所] 碩博士論文

    文件中的档案:

    档案 大小格式浏览次数
    098THU00030008-001.pdf1524KbAdobe PDF840检视/开启


    在THUIR中所有的数据项都受到原著作权保护.


    本網站之東海大學機構典藏數位內容,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈